top of page

African Gold Commences its Maiden Drill Program at the High Grade Didievi Gold Project



HIGHLIGHTS

  • Fully funded 3,000m diamond and RC drill campaign at Didievi Gold Project in Côte D'Ivoire underway

  • Priority will be follow up historical drilling along the 1.4km long Blaffo Gueto prospect with prior high grade intercepts:

- 89.0m at 3.0g/t Au from 0m

- 43.0m at 4.3g/t Au from 57m

- 69.0m at 2.9g/t Au from 31m; and

- 37.0m at 7.7g/t Au from 42m

  • Further targets to be tested include:

- Pranoi with prior results of 12m at 5.60g/t Au from 24m and 15.0m at 1.74g/t

Au from 0m

- BG Central, BG South and South West where previous drilling returned:

- 88m at 1.0g/t Au; 12m at 2.8g/t Au; and

- 63m at 1.06g/t Au

  • Drilling is expected to take 2 months with results to be released after all assays received


Click here for Full ASX Announcement





bottom of page