
HIGHLIGHTS
Fully funded 3,000m diamond and RC drill campaign at Didievi Gold Project in Côte D'Ivoire underway
Priority will be follow up historical drilling along the 1.4km long Blaffo Gueto prospect with prior high grade intercepts:
- 89.0m at 3.0g/t Au from 0m
- 43.0m at 4.3g/t Au from 57m
- 69.0m at 2.9g/t Au from 31m; and
- 37.0m at 7.7g/t Au from 42m
Further targets to be tested include:
- Pranoi with prior results of 12m at 5.60g/t Au from 24m and 15.0m at 1.74g/t
Au from 0m
- BG Central, BG South and South West where previous drilling returned:
- 88m at 1.0g/t Au; 12m at 2.8g/t Au; and
- 63m at 1.06g/t Au
Drilling is expected to take 2 months with results to be released after all assays received
Click here for Full ASX Announcement